Past Performance

San Antonio Independent School District (SAISD) Tafolla Middle School, Page Middle School & David Middle School – Upgrade Mechanical Systems 20 Ton Package Units, Controls and Ductwork

City Of Austin Technicenter (Chevron Energy Solutions)  – VAV Retrofit, VFDs & Chilled Water Pumps/Piping

City Of Austin Technicenter (Chevron Energy Solutions)

Orange Leaf at The Vineyard – Installation of Package Chiller

Texas Air National Guard –  Bldg 968 – Installation of  Trane Air Cooled Chiller

US Air Force (Services) – Installation of Liebert Units & Cummins Backup Generator

Baptist Temple Church – Installation of Smoke Detectors in Air Handler Units to Comply with City Codes

Brooks Development Authority – Bldg 125 Installation of Steam Coils

Brooks Development AuthorityBldg 803 Installation of Data Aire Unit

Red Roof Inn (Airport) – Installation of Rooftop Unit

Red Roof Inn (Airport)

Brooks Development Authority Bldg 722 Mechanical Systems Replacement

Christ the King Catholic Church – Installation of Condensing Unit

Thelka Ray Investments – Installation of 50 Ton Trane Chiller & Hydronic Accessories

US Department of LaborGary Job Corp – Ventilation Improvements in  Various Buildings

Brooks Development Authority – Bldg 930 Marley Cooling Tower Repairs

1859 Historic Hotels (Menger Hotel) –  Cooling Tower Replacement

City of San Antonio (Columbia Heights) – Installation of Trane Condensing Unit

Walmart #3279 San Antonio – Installation of Aaon Units

Walmart #3279 San Antonio

City of San Antonio (Fire Department – Fire Training Academy) – Installation of 60 Ton Chiller Compressor

Kerrville State Hospital – Installation of Fire Dampers and Ductwork

VIA Metropolitan Transit (Paint Ventilation Facility) – Retrofitted w/Aaon Units and Duct Modifications

City of San Antonio (Carver Community Center) – Installation of (2) Trane Rooftop Package Units

Tyson Foods – Installation of Multiple Rooftop Units & Liebert Unit

Crowne Plaza Hotel (Airport) – Installation of Rooftop Package Unit

Brooks Development Authority – Bldg 125 Steam Tube Bundles

Clarity Guidance Center – Installation of Ductless Mini-Split System

Brooks Development AuthorityBldg 125 Mechanical Code Compliance Repairs

St Margaret Mary Catholic Church – Installation of Ruud Rooftop Unit

Texas Air National Guard -Bldg 935

Texas Air National Guard – Bldg 935 – Installation of Trane 50 Ton Air Cooled Chiller

City of San Antonio (Willie Velasquez) – Installation of (2) York Rooftop Package Units

Lackland 149th Fighter Wing – Installation of RayPak Boiler Heat Exchanger

Kickapoo Lucky Eagle Casino – Installation of (8) Chilled Water Coils

City of San AntonioAlamodome 4th Floor Suite Renovations – Installation of Chilled Water Fan Coils & Controls

Alamo Colleges – St Philips College SW Campus – Installation of 40 Ton Trane Rooftop Unit  with VAV Boxes and Ductwork

Comments are closed.